Escondido, California High Wind Watch in effect until Sunday, October 18 at 12:00 AM. Next meeting: Planning Commission Meeting · Oct 13, 2026 73°F · Sunny

From the Hidden Valley

Escondido Everyday

Every day, from the record itself.

Machine generated from public records. Verify before relying on it.

Building permit

3 ton split system change out in same location. at 1276 Dos Hermanos Gln (B26-1001)

Permit B26-1001, Residential - HVAC: 3 ton split system change out in same location. at 1276 Dos Hermanos Gln (ISSUED).

The record

Permit
B26-1001
Type
Residential - HVAC
Address
1276 Dos Hermanos Gln
Description
3 ton split system change out in same location.
Status
ISSUED
Report period from
2026-05-11
Report period to
2026-05-15

Read the source document